Lost Ridge Trail Almost Completed
On 19/August/2006, the San Gabriel Mountains Trailbuilders returned to
the Crystal Lake Recreation area to finish the trail work needed to
complete the Lost Ridge Trail, a fairly easy hike where one end of the
trail is at Deer Flats and the other meets Lake Road.
Hiking trails are established in these recreation areas in an attempt to
concentrate foot traffic (and thus erosion and pollution) along official
routes through the mountains while providing some measure of safety for
hikers and campers. While the Crystal Lake Recreation area is currently
closed and has been since 2002, the area is being worked on by professional,
commercial companies and by volunteers such as the San Gabriel Mountains
Trailbuilders.
As you might imagine, this is hot, sweaty work consisting of hand tools
that are carried in on the backs of volunteers. This particular day saw
basically two different directions of work taken: tread work widening and
reshaping existing trail sections and the rock stepping platforms that were
created.
Tread work required the use of basically a pickaxe that has a hoe-like blade
on the other end, and the use of a McCloud which has fork tines on one side
and a hoe on the other. Rock stepping platform work required the use of
heavy metal bars, sledge hammers, shovels, picks, buckets, and a great
deal of muscle and sweat (and, to be sure, a significant amount of polite
cussing.)
The group collected down in Azusa, California where each team member signed
the appropriate forms before the crews headed up in cars to the Rincon Fire
Station (North 34 degrees, 14.323 by West 117 degrees, 51.753.) There we
collected some additional tools we would need for the day's effort.
From there we headed up to the Crystal Lake Recreation area, checking
through the locked barricade gate at mile marker 29.65 before completing
the additional 11 or 12 miles or so to the Crystal Lake gate. Work began
around 9:00 a.m. about in the middle of the trail (approximately North 34
degrees, 19.457 by West 117 degrees, 50.115) and lasted until around 3:00
p.m.
A great deal of effort was expended on establishing four rock steps along
a fairly steep section of the trail. That work involved moving and
positioning large rocks so that the steps would survive (hopefully
survive) heavy rains as well as heavy foot traffic.
As you can see from the photographs, the area has been slaughtered by
fires (the Williams Fire and the Curve Fire did a lot of damage.)
Additionally there's been countless trees killed by bark beetle
infestations. The area is making a slow comeback, however, and by the
time the area is opened up, things will look a bit better than they
currently do.
After the work ended, it was decided that we'd probably need another
day to actually finish everything. Down below after the end of the work
we were treated to cold soft drinks and some rest.
My son and I bicycled back down the mountain later that evening after
everyone else had gone back down in their vehicles. I had intended to
stay two nights up there however the caretaker up there had forgotten I
was coming and wasn't up there. Lacking my tent and blanket, we decided
not to stay and headed down.
The next morning I got a photograph of Led Zeppelin, the family cat
taking it easy in a tree.
This report is dedicated to Jeffrey Lures.
You may leave a comment about this page which everyone else will be able to read:
Working with McLouds, picks, and shovels
Some rocks had to be broken up and removed while others were used for steps
Large boulders are moved by hard work, metal bars
This is a very good trail to hike on, one that's safe once again
Volunteers do as much work or as little work as they wish!
Many trees survived the fires that went through here
The Curve fire and beatle infestation has killed most pine trees
Talking about how to move a boulder around for a step
A look at the canyons and mountain tops across the way
And boulders still take a lot of effort to fit into the trail
Mike likes to pound boulders into gravel with a hammer
We break for lunch!
Yucca plants can grow right on the trail
A finished section of the trail
A look along the section of the trail already restored
And I think this may be a duplicate of a previous photograph
We get back to work
Buckets are used to move rocks, sand, gravel and stuff
After work we relax with cold soft drinks
This web site is not operated or maintained by the US Forest Service, and
the USFS does not have any responsibility for the contents of any page
provided on the http://CrystalLake.Name/ web site. Also this web site is
not connected in any way with any of the volunteer organizations that are
mentioned in various web pages, including the
San Gabriel Mountains
Trailbuilders (SGMTBs) or the
Angeles Volunteers Association
(AVA.) This web site is privately owned and operated.
Please note that information on this web page may be inaccurate.